|
Conference Full Papers |
|
The Theory of Project Management: explanation to novel methods |
|
Lauri Koskela and Greg Howell |
|
Sven Bertelsen and Lauri Koskela |
|
Bridging the Gaps: towards a comprehensive understanding of lean Construction |
|
Sven Bertelsen |
|
Nuno Gil |
SAFETY, QUALITY AND ENVIRONMENT
|
Working Near the Edge: a new approach to construction safety |
|
Gregory A. Howell, Glenn Ballard, Tariq S. Abdelhamid and Panagiotis Mitropoulos |
|
Safety and Production: an integrated planning and control model |
|
Tarcisio A. Saurin, Carlos T. Formoso, Lia B. M. Guimarães and Alexandre C. Soares |
|
Physical Demands of Construction Work: a source of workflow unreliability |
|
Tariq S. Abdelhamid and John G. Everett |
|
Quality Management Tools for Lean Production: moving from enforcement to empowerment |
|
Marton Marosszeky, R. Thomas, Khalid Karim, S. Davis and D. McGeorge |
|
The Importance of Project Culture in Achieving Quality Outcomes in Construction |
|
R. Thomas, Marton Marosszeky, Khalid Karim, S. David and D. McGeorge |
|
Environmental Performance and Lean Construction Concepts: can we talk about a 'clean construction'? |
|
Clarice Menezes Degani and Francisco Ferreira Cardoso |
|
Construction Supply Chain Modeling: a research review and interdisciplinary research agenda |
|
William J. OBrien, Kerry London and Ruben Vrijhoef |
|
RubenVrijhoef, Ype Cuperus and Hans Voordijk |
|
Case Study in Application of Project Scheduling System for Construction Supply Chain Management |
|
Kalyan Vaidyanathan |
|
Identification and Classification of Value Drivers for a New Production Homebuilding Supply Chain |
|
John Taylor and Hans Björnsson |
|
Roberto J. Arbulu and Iris D. Tommelein |
|
Roberto J. Arbulu and Iris D. Tommelein |
|
Subcontracting and Cooperation Network in Building Construction: a literature review |
Julio Y. Shimizu and Francisco F. Cardoso |
PREFABRICATION AND SITE INSTALLATION
|
An Application of Lean Concepts and Techniques to Precast Concrete Fabrication |
Glenn Ballard, Nigel Harper and Todd Zabelle |
|
Jan Elfving, Iris D. Tommelein and Glenn Ballard |
|
M. J. Mawdesley and G. Long |
|
Christine L Pasquire and Gary E Connolly |
|
Applying the Concept of Mobile Cell Manufacturing on the Drywall Process |
|
Aguinaldo dos Santos, L. Moser and J.E. Tookey |
|
Technological Interventions in the Control of Services in a Lean Environment |
|
Luiz Fernando M. Heineck, Madalena Osório Leite, Pedro Eduardo Pereira and Francisco Eugênio Montenegro da Rocha |
|
Comparing and Implementing Alternative Work Structures: installation of door frames |
|
Cynthia C. Y. Tsao and Iris D. Tommelein |
|
Towards the Development of a Conceptual Design Management Model for Remote Sites |
|
Linda Kestle and Kerry London |
|
Michail Kagioglou, Angela Lee, Rachel Cooper, Stuart Carmichael and Ghassan Aouad |
|
Janayna Patrícia R. de Aquino and Silvio Burrattino Melhado |
|
Concurrent Engineering in Construction: studies of brief-design integration |
|
Maria Julia M. Mesquita, Márcio M. Fabrício and Silvio B. Melhado |
|
Kelly P. Inouye, Silvio B. Melhado and Ubiraci E. L. Souza |
|
Michael Whelton and Glenn Ballard |
|
Patricia Tzortzopoulos, Martin Betts and Rachel Cooper |
|
Developing Incentive Strategies for Implementation of Lean Construction |
|
Luis F. Alarcon and Loreto Seguel |
|
Eric Johansen, Henk Glimmerveen and Ruben Vrijhoef |
|
José de Paula Barros Neto |
|
Carlos Ricardo Rossetto, Adriana M. Rossetto and Rodrigo B. de Mello |
|
The Strategic Adaptation in the Construction Industry: a case study in the town of Passo Fundo (RS) |
|
Carlos Ricardo Rossetto, Edson Salvador and Rodrigo B. de Mello |
|
The Almere Monitor: an evaluation of 19 consumer oriented housing projects in The Netherlands |
|
Ype Cuperus |
PRODUCTION PLANNING AND CONTROL
|
Alexandre C. Soares, Maurício M. S. Bernardes and Carlos T. Formoso |
|
Contributions to the Evaluation of Production Planning and Control Systems in Building Companies |
|
Maurício M. S. Bernardes and Carlos T. Formoso |
|
Applying the Last Planner Control System to a Construction Project: a case study in Quito, Ecuador |
|
Mario Fiallo C. and Víctor Hugo Revelo P. |
|
Formulating the Work Flow Plan for Horizontal Projects: case study |
|
Fernanda Aranha Saffaro and Edi Carlos Pires de Paula |
|
Stochastic Analysis on Project Duration Under the Requirement of Continuous Resource Utilization |
|
I-Tung Yang |
|
Collaborative Implementation of Lean Planning Systems in Chilean Construction Companies |
|
Luis F. Alarcón, Sven Diethelmand and Oscar Rojo |
|
Antonio Sergio Itri Conte |
|
Yong-Woo Kim and Glenn Ballard |
|
A Study of the Relationship Between Buffers and Performance in Construction |
|
Masanobu Sakamoto, Michael J. Horman and H. Randolph Thomas |
|
Antonio N. de Miranda Filho and Emílio Araújo Menezes |
|
Hans E. Picard |
|
Luiz Fernando M. Heineck, Pedro Eduardo Pereira, Madalena Osório Leite, José de Paula Barros Neto and Igor Barros Pinho |
|
Non Value-Adding Activities: a comparative study of indonesian and australian construction projects |
|
Sugiharto Alwi, Keith Hampson and Sherif Mohamed |
|
The evaluation of alternative production system designs with discrete event simulation |
|
John D. Draper and Julio Martinez |
|
Implementing Electronic Document Management System For a Lean Design Process |
|
André Carneiro Giandon, Ricardo Mendes Junior and Sergio Scheer |
|
Next Generation of Construction Planning and Control System: the lewis approach |
|
Eknarin Sriprasert and Nashwan Dawood |
|
Carlos H. Caldas and Lucio Soibelman |
|
Specification Standards for the New Management Settings of Construction |
|
Sérgio R. Leusin de Amorim, Lucia Peixoto, Roberta Nunes and Luís C. Madeira |